Transit Improvements (Concept N)

Type:

Small

Complexity:

Low

Priority:

Short term

Cost:

$250,000

Goals:

Improve transit infrastructure and service to promote alternative travel modes

Elements:
  • Formalize bus stop locations at Quarry Heights, Brainerd Place, Portland Shopping Center, East Hampton Shopping Center, and Edgewater Hill Development along MAT Route 586 (Former Route F)
  • Provide bus shelters at regular bus stops along the route
  • Improve sidewalk connectivity to bus stop locations from transit generating uses
Permits:
  • Town roadway construction permits for construction within Town right-of-way
  • Encroachment permits for construction within CTDOT right-of-way