Route 66 at Lake Drive Safety Improvements (Concept M)

Type | Complexity | Priority | Cost |
|---|---|---|---|
Small | Moderate | Mid term | $380,000 |
Goals:
Realign Lake Drive at Route 66 to improve sightline, intersection geometry, vehicular turning operations and mitigate safety concerns at the intersection
Elements:
Realign Lake Drive at the Arrow Fence driveway to be perpendicular to Route 66
Permits:
Town roadway construction permits for construction within Town right-of-way
CTDOT approval and/or encroachment permit for construction within CTDOT right-of-way
Route 66 Corridor Study Projects:
1. Marlborough Street at Main Street Intersection Improvements (Concept A-3)
2. Route 66 Pedestrian Mobility Improvements (Concept B)
3. Multi-Modal Mobility Enhancements (Concept C)
4. Route 66 Eastbound Merge Lane Area Safety Improvements (Concept D)
5. Route 66 at Portland Citgo and Opticom Driveways Operational Improvements (Concept E)
6. Route 66 at Portland Ledges Area Safety Improvements (Concept F)
​
7. Route 66 at Route 151 and Depot Hill Road Intersection Improvements (Concept G)
8. Route 66 at Route 16 and Park & Ride Driveway Intersection Improvements (Concept H)
9. Route 66 at Childs Road Operational Improvements (Concept I)
10. Route 66 at East Hampton Commercial District Improvements (Concept J)
11. Route 66 at Paul’s & Sandy’s Too Safety Improvements (Concept K)
​
12. Route 66 at Edgewater Hill Driveway Intersection Improvements (Concept L-1)
13. Route 66 at Edgewater Hill Driveway Modern Roundabout (Concept L-2)
​
14. Route 66 at Lake Drive Safety Improvements (Concept M)
​
15. Transit Improvements (Concept N)
​